Mechanical Installation Works /Badra


Scope of Work

The work included the following:

  1. Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units), Horizontal & Centrifugal Pumps, Electrical Crane, Installation of Stationary Equipment (Vessels, Drums, Columns, Heat Exchangers, Filters).
  2. Fabrication and Installation of Storage Tanks.
  3. Hydrostatic Testing and Cleaning Services
  4. Fabrication and Installation of Piping Systems (CS, SS, Alloy Steel)
  5. Installation of Pipeline
  6. Launcher and Receiver Fabrication and Installation
  7. Installation of Valves and Other Piping Elements
  8. Sandblasting, Panting and Coating Services
  9. NDT
  10. Hydro Testing Services
  11. Flange Torqueing and Bolt Tightening
  12. Installation MV,HV,LV panels and Transformer
  13. Installation power and control cables
  14. Installation and commissioning the instrumentation works
  • Period

    Start: November 2015, Finish: December 2016

  • Location

    Badra Oil Field , CPF Phase 2

  • Client

    Gazprom/Samsung Engineering