Installation Piping System/CPF
Scope of Work
Details engineering , Fabrication and Installation Piping system with Procurement the missing Materials
Testing for power Transformer
The work including but not limited the following:
- Design , fabrication and installation and testing piping system
- Supplying all missing materials such as (pipes, fitting, flanges, valves, etc.)
- Design, Installation and testing the flow lines between the well head and the manifolds with different sizes (6" up to 48").
- Installation and testing the MV and LV cables with different sizes (70 mm2 up to 500mm2) along with pipe line.
- Demolition and installation new piping system at the existing plants at the Garraf oil field with all the related works (testing and commissioning)
- Sand blasting and painting all the fabricated piping system.
- Supplying, fabrication and installation all kind of steel pipe supports.
-
Period
18 months, Start: January 2012, Finish: June 2013
-
Location
Badra Oil Field , Iraq
-
Client
Petrofac Limited