Installation Train (C) Pipe Rack / Badra


Scope of Work

The work included the following:

  1. fabrication and installation the concrete footing
  2. Erection the steel members
  3. Shop fabrication
  4. Bolt tightening
  5. Touch painting
  • Period

    Start: February 2012, Finish: December 2012

  • Location

    Badra Oil Field, CPF Phase 1

  • Client

    Gazprom / Petrofac

Project Highlights